Base Depth Rules for Real Projects
- Start with approximately one-third of above-grade post height in-ground, then adjust by load and soil.
- Increase depth for gate posts, wider spans, and heavier infill assemblies.
- Set footing bottoms below local frost depth in freeze-thaw climates.
- Increase footing diameter where soils are loose, saturated, or highly expansive.
